Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "cookie_script_api" was enqueued with dependencies that are not registered: wp-consent-api. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /home/eurocas4/staging.interreg.eurocastaliahost4.com/wp-includes/functions.php on line 6131
Hospital SUDOE 4·0

Smart energy management in hospitals

Axis 3: Low-carbon economy
OBJECTIVE 4C1 :
Improving energy efficiency policies and the use of renewable energy sources in public buildings and housing through the implementation of networks and joint experimentation
STATE: En curso
CODE: SOE3/P3/E0946
TOTAL ELIGIBLE COST (€)
1.406.848,88
AID FEDER (€)
1.055.136,66
Maite Cobo

PROJECT MANAGER

maite.cobo@itcl.es
SECTORS: Use of renewable energy sources in housing
ANNOUNCEMENT: Tercera
DURATION:
1 October, 2019
30 September, 2022
RESULTS: 2022-03-31
PRIMARY BENEFICIARY:
Instituto Tecnológico de Castilla y León
OTHER BENEFICIARIES:
  • 2. Dirección General de Arquitectura. Secretaria de Arquitectura, Vivienda y Políticas de Consumo. Consejería de Sanidad y Políticas Sociales. Junta de Extremadura. ES
  • 3. Fundación para la Formación e Investigación de los Profesionales de la Salud de Extremadura FundeSalud ES
  • 4. Chambre de Commerce et d?Industrie Bayonne Pays Basque FR
  • 5. NOBATEK/INEF4 FR
  • 6. ADENE - Agência para a Energia PT
  • 7. Instituto Superior Técnico PT
  • 8. Ecole Supérieure des Technologies Industrielles Avancées FR

The objective of Hospital SUDOE 4-0 is to develop and to build instrument of smart management in order to ensure a lower energy consumption of hospitals and health centres. Moreover, the participation of administrations will be encourages in order the latter to adopt those instruments, including them into public policies on energy transition.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.