Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "cookie_script_api" was enqueued with dependencies that are not registered: wp-consent-api. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /home/eurocas4/staging.interreg.eurocastaliahost4.com/wp-includes/functions.php on line 6131

Summary

The implementation of the 3 pilot actions contributes to the RCO84 Programme Implementation Indicator. Pilot action number 1 will consist of the creation and implementation of an energy community in the town of Bembibre, which will also study the implementation of the results of pilot action number 2 and 3 in order to replicate a sustainable mobility system based on green hydrogen as an engine and take advantage of possible surpluses for the distribution of natural gas. Action number 2 will integrate a self-consumption system and test a hydrogen bike system that will be tested in both Bembibre and Portalegre. Action 3 shall launch a demonstration laboratory in which application simulations will be carried out to adopt solutions to real cases: conversion of traffic, distribution of natural gas, modernisation of agricultural transport, etc.

Description

The implementation of the 3 pilot actions contributes to the RCO84 Programme Implementation Indicator. Pilot action number 1 will consist of the creation and implementation of an energy community in the town of Bembibre, which will also study the implementation of the results of pilot action number 2 and 3 in order to replicate a sustainable mobility system based on green hydrogen as an engine and take advantage of possible surpluses for the distribution of natural gas. Action number 2 will integrate a self-consumption system and test a hydrogen bike system that will be tested in both Bembibre and Portalegre. Action 3 shall launch a demonstration laboratory in which application simulations will be carried out to adopt solutions to real cases: conversion of traffic, distribution of natural gas, modernisation of agricultural transport, etc.

Periodo: 2021-2027
Estado: On going
Announcement: 1st call
Priority : 1 - Preserving Sudoe's natural capital and adapting to climate change
Objetivo: SO 2.7 (...) Protection and preservation of nature / biodiversity / green infrastructure
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.